146 Chapter 24 Failed control processor replacement
NN10600-175 6.1S2
• “Multiservice Switch Node Recovery”. See 241-6001-807 Nortel
Networks Multiservice Data Manager Network Backup and Restore.
• “Removing a control processor” (page 416)
• “Resetting the alarm hardware” (page 506)
• “StartUp overview”. See NN10600-271 Nortel Networks Multiservice
Switch 7400/15000/20000 Network Management Connectivity.