72 Chapter 6 Multiservice Switch 7460 replacement
NN10600-175 6.1S2
Task flow navigation
The following references are listed alphabetically:
• “Card testing”. See NN10600-520 Nortel Networks Multiservice Switch
7400/15000/20000 Fault and Performance Management:
Troubleshooting.
• “Grounding a dc-powered Multiservice Switch 7460” (page 229)
• “Multiservice Switch 7460 installation” (page 57)
• “Powering down a Multiservice Switch” (page 391)
• “Powering up a Multiservice Switch 7460” (page 397)
• “Removing the cooling unit from a Multiservice Switch 7460”
(page 458)
• “Removing the power supply from a Multiservice Switch 7460”
(page 471)
• “Removing the shelf assembly of a Multiservice Switch 7460”
(page 480)
• “Removing a control processor” (page 416)
• “Removing an FP” (page 441)
• “Removing a shelf interconnect cable” (page 439)
• “Removing power cables” (page 447)
• “Testing a bus”. See NN10600-520 Nortel Networks Multiservice Switch
7400/15000/20000 Fault and Performance Management:
Troubleshooting.
• “Testing ports and interfaces”. See NN10600-520 Nortel Networks
Multiservice Switch 7400/15000/20000 Fault and Performance
Management: Troubleshooting.
• “Unpacking a Multiservice Switch 7460” (page 533)