EasyManua.ls Logo

Nortel 7400 - Multiservice Switch 7480 Replacement Task Flow

Nortel 7400
550 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
84 Chapter 8 Multiservice Switch 7480 replacement
NN10600-175 6.1S2
Before you can replace a shelf, you must assemble enough anti-static
packaging for the processor cards, and clear an area large enough to
temporarily store all them. You also need to have appropriate packaging
materials so that you can store or ship the removed shelf. See
“Unpacking
a processor card” (page 539) for FP and CP handling instructions.
Some of the procedures in this task are located in NN10600-550 Nortel
Networks Multiservice Switch 7400/15000/20000 Common
Configuration Procedures, so ensure that you have a copy of this
document available.
Some of the procedures in this task are not located in this document.
Ensure that you have access to the required documents.
Multiservice Switch 7480 replacement task flow
This task flow shows you the sequence of procedures you do to replace a
Nortel Networks Multiservice Switch 7480. To link to any procedure, go to
“Task flow navigation” on page 87.

Table of Contents

Related product manuals