iv
AN2016 Cabinet User Guide Rel 1.0 Standard May 1999
Equipment layout 2-30
Access bandwidth manager shelf 2-32
Breaker interface panel 2-34
Local craft access panel 2-35
Copper-distribution shelf 2-36
Equipment fan shelves 2-38
Fan alarms 2-38
Peripheral equipment descriptions 2-39
Rectifiers 2-39
Batteries 2-41
DC distribution shelf 2-41
DSX-1 cross-connect facilities 2-43
Repeater/span DS1 termination facilities 2-48
Mechanical specifications 2-48
Operational specifications 2-49
Environmental control 2-49
Acoustic noise 2-49
Temperature 2-50
Relative humidity 2-50
Altitude 2-50
Altitude conditions and limits 2-51
Regulatory specifications 2-51
Additional information 2-53
Power and grounding 2-53
Alternating current power entrance 2-53
Direct current power requirements 2-53
Battery backup 2-54
Power consumption 2-54
Grounding 2-54
Installation guidelines 3-1
Procedures in this chapter 3-1
3-1 Unpacking the cabinet 3-2
3-2 Selecting the site 3-3
3-3 Preparing a concrete mounting pad for the cabinet 3-4
3-4 Preparing the cabinet for installation 3-12
3-5 Routing the cables to the mounting pad 3-18
3-6 Mounting the cabinet on the pad 3-21
3-7 Leveling the cabinet 3-24
3-8 Installing the cable in the split sleeve 3-26
3-9 Connecting the earth ground to the cabinet 3-28
3-10 Installing the surge arrestor 3-32
3-11 Connecting ac power 3-34
3-12 Installing batteries 3-37
3-13 Installing battery cables from an external vault 3-42
Alarms 4-1
Alarm block location and description 4-1
Alarms definitions 4-3
AC fail alarm 4-3