Maintaining and Servicing the NVIDIA DGX Station
DGX Station DU-08255-001 _v4.6|76
If the liquid has fallen below the Maximum Level in the reservoir, repeat the following
sequence of steps until level of the liquid in the cooling system remains at the Maximum
Level.
a). Remove the filler cap at top of the cooling system pump.
b). Dispense more coolant liquid into the pump until the liquid reaches the Maximum
Level in the reservoir again.
c). Replace the filler cap at top of the pump.
d). Power on the DGX Station and let it run for one minute.
e). Check the level of the liquid in the cooling system.
9. Power off the DGX Station.
10.Replace the side panel of the DGX Station.
a). Align the bottom edge of the side panel with the bottom edge of the DGX Station.
b). Firmly push the panel back into place to re-engage the latch.