EasyManua.ls Logo

Omicron CP TD12 - User Manual

Omicron CP TD12
65 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
CP TD12/15
User Manual

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Omicron CP TD12 and is the answer not in the manual?

Omicron CP TD12 Specifications

General IconGeneral
BrandOmicron
ModelCP TD12
CategoryMeasuring Instruments
LanguageEnglish

Summary

About this manual

Safety symbols used

Explains the meaning of safety symbols used in the manual to indicate hazards.

Related documents

Safety instructions

Operator qualifications

Details the required qualifications and responsibilities of personnel operating the CP TD12/15.

Safety standards and rules

Outlines essential safety standards, rules, and regulations for testing with the CP TD12/15.

General operating guidelines

Provides general usage guidelines and safety precautions for the CP TD12/15.

Operating the measurement setup

Details the procedures for setting up and operating the CP TD12/15 with a control device.

Handling cables safely

Provides detailed instructions and warnings for connecting and disconnecting cables for the CP TD12/15.

Orderly measures and static charge precautions

Covers orderly measures, static charge handling, and warranty disclaimers for the CP TD12/15.

Compliance and recycling information

Details compliance statements (EU, USA, Canada) and recycling instructions for the CP TD12/15.

Introduction

Designated use

Specifies the intended and proper usage of the CP TD12/15 test system.

CPC 100 front panel overview

Details the front panel layout and controls of the CPC 100 test system.

CPC 100 side panel overview

Details the side panel layout and connectors of the CPC 100 test system.

CPC 80 front panel overview

Details the front panel layout and controls of the CPC 80 test system.

CPC 80 side panel overview

Details the side panel layout and connectors of the CPC 80 test system.

Status lights interpretation

Explains the meaning of the status lights on the CPC 100 and CPC 80 for operational indication.

Emergency Stop button function

Describes the function and operation of the Emergency Stop button for immediate shutdown.

ePC interface connectors and LEDs

Details the ePC interface connectors and status LEDs on the CPC 100 and CPC 80.

TESTRANO 600 front panel overview

Details the front panel layout and controls of the TESTRANO 600.

TESTRANO 600 side panel overview

Details the side panel layout and connectors of the TESTRANO 600.

CP TD12;15 grounding terminal and booster input

Explains the grounding terminal and booster input on the CP TD12/15.

CP TD12;15 serial interface and measuring inputs

Details the serial interface connector and measuring inputs (IN A, IN B) of the CP TD12/15.

CP TD12;15 high-voltage connector

Details the high-voltage connector with its interlock function on the CP TD12/15.

Safety and interlock functions

Explains the internal and external safety and interlock functions of the CP TD12/15.

Cleaning procedures

Provides instructions for cleaning the CP TD12/15 and its accessories.

Application

On-site preparation and safety

Outlines essential preparation steps and safety precautions before operating the CP TD12/15 on-site.

Connecting to control devices

Provides detailed instructions on connecting the CP TD12/15 to CPC 100, CPC 80, or TESTRANO 600.

Measurement procedures and control options

Explains how to perform measurements and lists control options (CPC, PTM) and their manuals.

Disconnecting the CP TD12;15 safely

Provides step-by-step instructions for safely disconnecting the CP TD12/15 after testing.

Introduction to capacitance and dissipation factor measurement

Theory of C and DF measurement

Explains the theoretical basis of capacitance and dissipation factor measurements in capacitors.

Measuring Capacitance and Dissipation Factor

Details the measurement principle and method for capacitance and dissipation factor.

UST and GST measurements with Guard Technology

Explains UST and GST measurement modes using guard technology for insulation analysis.

Power transformers

General preparation for power transformers

Outlines general safety and connection procedures for testing power transformers.

Dissipation factor measurement and environmental conditions

Details dissipation factor measurement and the impact of environmental conditions on test results.

Capacitance measurement for transformers

Explains capacitance measurement for transformers and its diagnostic value.

Two-winding transformer insulation analysis

Describes the insulation components of a two-winding transformer for measurement.

Necessary measurements for two-winding transformers

Details the necessary measurements for two-winding transformers according to IEEE 62-1995.

Two-winding transformer tests with CPC 100;80

Shows test preparation and results for two-winding transformers using CPC 100/80.

Two-winding transformer tests with TESTRANO 600

References TESTRANO 600 manual for Tan Delta measurements on transformers.

Three-winding transformer insulation analysis

Details the insulation components of a three-winding transformer for measurement.

Necessary measurements for three-winding transformers

Details the six necessary measurements for three-winding transformers as per IEEE Std. 62-1995.

Three-winding transformer tests with CPC 100;80

Illustrates data input and connection instructions for three-winding transformer tests with CPC 100/80.

Three-winding transformer tests with TESTRANO 600

References TESTRANO 600 manual for Tan Delta measurements on three-winding transformers.

Auto-Transformer testing

Describes the measurement process for auto-transformers.

Reactor testing

Details the measurement process for reactors.

High-voltage bushings

Capacitance and DF measurement on bushings

Explains the importance and procedure for measuring capacitance and DF on bushings.

Ungrounded Specimen Test (UST)

Details the Ungrounded Specimen Test (UST) method for bushing insulation analysis.

Grounded Specimen Test (GST)

Details the Grounded Specimen Test (GST) method for bushing insulation analysis.

Hot collar test for bushings

Describes the hot collar test used to supplement bushing tests and locate defects.

Assessing bushing measurement results

Provides guidance on assessing bushing capacitance and DF measurements, including temperature correction.

Technical data

CP TD12;15 technical data with control device

Details technical data for the CP TD12/15 when used with a control device.

High-voltage output specifications

Provides specifications for the high-voltage output of the CP TD12/15.

Measurement specifications and test frequencies

Details measurement capabilities and available test frequencies for the CP TD12/15.

Filter and current measurement specifications

Provides specifications for selective filters and test current measurements.

Test voltage specifications

Details the test voltage ranges and accuracy for CP TD12 and CP TD15.

Capacitance, Dissipation Factor, Power Factor, and Phase Angle

Specifies accuracy and conditions for capacitance, DF, PF, and phase angle measurements.

Impedance, Inductance, Quality Factor, and Power measurements

Provides specifications for impedance, inductance, quality factor, and power measurements.

Mechanical and environmental specifications

Details mechanical dimensions, weight, operating conditions, and noise immunity.

Standards conformity

Lists the safety, EMC, and other standards to which the CP TD12/15 conforms.

Support

24;7 Technical support

Offers 24/7 technical support hotlines and online resources for prompt assistance.

Customer Portal and Academy

Details the Customer Portal for information and the OMICRON Academy for training.

Related product manuals