SECTION 5
Trial Operation to Actual Operation
A connection/disconnection test can be performed on each branch output in Test Mode.
When the S8AS is shipped from the factory, all branch outputs are connected.
If you want to set unused branch outputs so that they are not connected, set those outputs to OFF in Test Mode.
5-1 Test Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
5-2 Connection/Disconnection Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
5-3 Checking Sequence Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
5-4 Run Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82

Table of Contents

Related product manuals