EasyManua.ls Logo

Omron SJDE-ANA-OY - Wiring the MECHATROLINK-II Communication Connectors (CN6 A and CN6 B)

Omron SJDE-ANA-OY
170 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.4 Main Circuit Wiring
41
Connector Pin Arrangement
3.4.6 Wiring the MECHATROLINK-II Communication Connectors
(CN6A and CN6B)
Number of Stations
A maximum of 30 slave stations can be connected when a repeater is connected. The maximum num-
ber of slave stations that can be connected is determined by the MECHATROLINK-II communications
settings. Refer to 3.8 Setting MECHATROLINK-II Communications for details.
Communication Cables
Use the cables specified in the table below.
Cable Length
The total cable length must be 50 m max. The cable length between stations must be 0.5 m min.
Terminator
Install a terminator on the SERVOPACK connected at the end of communication cable.
Typ e Model Length
MECHATROLINK Communication
Cable
(with connectors at both ends, without
ferrite core)
JEPMC-W6002- Specify the length in .
Refer to Page 31 for details.
JEPMC-W6002--E
(Compliant with RoHS
Directive)
MECHATROLINK Communication
Cable
(with connectors at both ends, with
ferrite core)
JEPMC-W6003-
JEPMC-W6003--E
(Compliant with RoHS
Directive)
Ter min at or Type Connector Type
MECHATROLINK-II Terminator JEMPC-W6022
JEMPC-W6022-E (Compliant with RoHS Directive)
1
3
5
7
2
4
6
9
11
13
8
10
12
14
TOEP_C710806_03A_1_0.book Seite 41 Montag, 2. Juli 2007 3:55 15

Table of Contents

Related product manuals