EasyManua.ls Logo

OPTIKON PULSAR2 ESP - Shut down Procedure

OPTIKON PULSAR2 ESP
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PULSAR
2
ESP
Installation and Operating Manual
OPTIKON 2000
Cod. 111007EN Rev.E
8-27
8.8 SHUT DOWN PROCEDURE
NOTE:
If the PULSAR
2
surgery system is not being used for an extended period, the following procedure
should be observed:
1) Depress "POWER" switch to switch off the control console.
2) Unplug the power cord and the gas supply tube from the wall outlets and
disconnect from back of console. Be sure to pull the plug, not the cord.
3) Disconnect footswitch from back of console.
4) Shut off the I.V. administration set roller clamp.
5) Remove irrigation and aspiration lines from the handpiece and control console.
6) Disconnect the handpieces connectors from control console and replace tip
protective caps.
7) Refer to the chapter "Cleaning, sterilization and maintenance".

Related product manuals