Made in the U.S.A.
TOOLING OPTIONS AND INSTALLATION
Measure and return
spring tension to
the factory provided
distance once com-
plete
Front linkage pivot
Remove this bolt once complete
7. Once the carriage bolts are tightened it may be necessary to loosen the spring tension
bolts, and/or use an alignment punch to install the front linkage pivot bolt.
Be sure to measure distance of spring tension before loosening it in order to return it to its
factory setting once the front linkage pivot bolt is installed.
Once trip linkage mounting bolts are tight and spring tension is returned to factory setting,
remove ¾” x 3” long main frame bolt that was installed for safety in step 5. The AR Link-
age installation is now complete.
D A N G E R
AVOID CRUSHING. Make sure all personnel are clear of the implement. Lower implement
to the ground, place tractor in park, turn off engine, and remove key.
USE BAR STANDS TO SUPPORT THE IMPLEMENT. Park implement on a clean, dry,
and level surface. An uneven surface could cause implement to shift or fall, resulting in
personal injury or death, as well as implement damage. Securely support all implement
components that must be raised. Remove buildup of grease, oil, or debris prior to
adjusting.
4 - 13