Installer manual Fleck 5800 LXT - Operation
60 / 96 Ref. MKT-IM-005 / F - 30.04.2020
ð The regeneration starts on the scheduled time. See Softener time clock delayed
programming [
→
Page52].
ð The service icon flashes.
Tip
To cancel: press again. The service icon stop flashing.
8.5.2 Immediate regeneration
1. Press and hold for 5seconds to initiate immediately a manual regeneration, regardless
from the programmed regeneration control type.
8.5.3 To advance regeneration cycles
1. Press to pass to the next regeneration cycle.
8.6 Operation during a power failure
• Current valve position, cycle step time elapsed, and time of day is stored 24hours during a
power failure, and will be restored upon power restoration;
• in regeneration, when power is shutting down, the controller saves the current regeneration
data. When power is restored, the controller resume the regeneration cycle at the point
where power failed;
Caution - material
Without power, the valve stay in its current position.
The valve system should include all required safety components to prevent overflows.
• all the program settings are stored in a permanent memory;
• time is kept during a power failure and the time of day is adjusted upon restoration of the
power (as long as the power is restored within 24hours);
• the time of day on the main display screen will flash when there has been a power failure;
• the flashing of the time of day can stopped by pressing any button on the display.