EasyManua.ls Logo

Pfaff 335

Pfaff 335
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11 - 13
Adjustment
11. 04.12 Thread check spring
Requirement
The movement of the thread check spring must be finished when the needle point enters
the material (= approx. 7 mm spring movement).
The length of the spring movement can vary a little upwards or downwards due to
changes in the sewing parameters.
1
3
2
Adjust stop 1 (screw 2) according to Requirement.
To adjust the pressure of the spring, turn screw
3 (screw 4).
Fig. 11 - 12
7 mm
4

Table of Contents

Other manuals for Pfaff 335

Related product manuals