EasyManua.ls Logo

Pilz PSENmlock mini - Page 60

Pilz PSENmlock mini
81 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Checks and maintenance
Operating Manual PSENmlock mini, PSEN mlm 1 sa 1.1/2.1/2.2
1005802-EN-02-Draft
| 60
There must be high signals at the inputs on the evaluation device (e.g. S11, S21 or I1,
I2).
} Open one gate; the other gates remain closed.
There must be low signals at the inputs on the evaluation device (e.g. S11, S21 or I1, I2).
} Close the gate again.
High signals must return at the inputs on the evaluation device (e.g. S11, S21 or I1, I2).
} Repeat the test for each gate.
} If the input signals do not react as described above, check and rectify the wiring and carry
out the test again.
Draft

Table of Contents

Related product manuals