EasyManua.ls Logo

Quick MILL 938545 - Hot Water Supply

Quick MILL 938545
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
106
Italiano
Deutsch
English
9.3 Hot water supply
Make sure the profiling lever (1) is in position.
Place the container for collecting water under the steam/water lance (2).
Press the hot water draw-off button (3): the internal led remains lit and the
display shows the letter
_A_
The pump starts and the water comes up to temperature (wait a few
seconds).
Open the tap (4) to dispense water.
Press the dispensing button again (3) and close the tap.
2
3
4
1

Table of Contents

Related product manuals