CHAPTER 3
14 CAN Sidekick Pro Injection for Case IH 3/4XXX Installation and Operation Manual
FIGURE 7. Weld-On Support Tab Placement
8. Weld the provided support tabs onto the axle in the position shown below. Weld on the top and bottom of the
tab.
FIGURE 8. Welded Support Tab
PREPARING HOSE GUIDE HOOPS
NOTE: If the hose is supported by clamps instead of guide hoops, rotate the clamps away from outside of
the parallel link arms. There must be at least 1” of clearance alongside the parallel link arms to
accommodate the tank and tank cage mounting.
1. Locate the hose guide hoops (if present) on the side of the right hand parallel link arm.
Support Tab
(107-0172-333)
Weld on Top and Bottom of Tab