EasyManua.ls Logo

Raven Sidekick Pro - Page 51

Raven Sidekick Pro
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation: Installation 49
INSTALLATION
FIGURE 71. Installed and Secured Hose (3XXX Machines)
FIGURE 72. Installed Rinse Valve Assembly (4XXX Machines)
NOTE: 4XXX rinse valve assembly is secured to the fill station using the existing fill station u-bolt clamp.
5. Connect one of the supplied 3/4” braided hose to the remaining open hose barb elbow port on the rinse tank
shut off valve.
6. Cut and connect the hose to the middle hose barb port of the rise tee fitting for dual pump stations, or directly
to the open 3/4” rinse port for single pump stations, using two provided hose clamps.
Rinse Hose Tee
Rinse Tank
Shutoff
Valve
Dual Pump Station
Rinse Tee (not used
for single pump
station)

Table of Contents

Other manuals for Raven Sidekick Pro

Related product manuals