Installation: Installation 53
INSTALLATION
FIGURE 78. Injection Tank Ports
FIGURE 79. Recirculation Hose Routing
5. Route the hose along the machine’s existing product hoses to the right side of tank 2.
6. Connect the supplied 1/2” braided hose to the 1/2” hose barb port on the top of the tank.
7. Secure the hose to each of the hose barbs using the provided hose clamp.
8. Protect the hoses from sharp edges using the provided nylon hose guard sleeve. If needed, cut sleeve to length
with a utility knife.
9. Secure the hose guard sleeve to the hoses with cable ties.
Recirculation Port
Overflow Port
Pump 1
Pump 2
Hoses from Pump 2
Recirculation Port to
Tank 2 Recirculation
Port Should be
Secured to existing
Product Hoses to
Parallel Link Support
Tower, then to Tank 2
Cage Before
Connecting to Tank 2
Recirculation Port.
Hoses from Pump 1
Recirculation Port to
Tank 1 Recirculation
Port Should be Secured
to Tank and Fill Hoses
Around the Front of the
Engine compartment,
Along the Frame, and
up to the Parallel Link
Support Tower, Then to
Tank Cage Before
Connecting to Tank 1
Recirculation Port.