EasyManua.ls Logo

Raven Sidekick Pro - Electrical Components Installation

Raven Sidekick Pro
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 3
52 CAN Sidekick Pro Injection for Case IH 3/4XXX Installation and Operation Manual
FIGURE 77. Installed Chemical Mixer
6. Secure hose to one of the open 1/2” hose barbs with two hose clamps.
7. Repeat step 1 through step 6 for the second pump and injection point (if applicable).
8. Apply the provided nylon hose guard sleeve to protect hoses from sharp edges.
RECIRCULATION SELECTOR VALVE TO TANK PLUMBING
1. Connect one end of the supplied 1/2 braided hose to the open port on the rearmost tank recirculation selector
valve.
2. Secure the hose to the hose barb using a single hose clamp.
3. Route the hose around the front of the engine compartment, following the installed hoses, to Tank 1.
4. Connect the hose to 1/2” hose barb tank recirculation port on the top of the tank. Secure with a hose clamp.
Tank 2
Chemical Mixer
Injection Points
Tank 1

Table of Contents

Other manuals for Raven Sidekick Pro

Related product manuals