EasyManua.ls Logo

Redline Communications RDL-3000 - Figure 12: Site Survey: System Grounding; Review System Grounding Requirements

Redline Communications RDL-3000
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Ellipse INSTALLATION GUIDELINES
70-00159-01-09 Proprietary Redline Communications © 2015 Page 24 of 52 April 29, 2015
Review System Grounding Requirements
Electrical events like lightning strikes and power surges cannot be prevented. Designing
and installing a good grounding system can help minimize damage caused by these
events. Improper grounding can result in a difference of potential between system
components which can lead to injury to personnel, system failure and equipment
damage.
Figure 12: Site Survey: System Grounding
Masts/towers shall have grounding systems installed. All elements of the tower, fence,
gates and miscellaneous site metalwork shall be bonded to the earth. In addition, the
following areas must be considered in the overall grounding system for the site:
All ground rods are to be driven a min of 150 mm (0.5 ft) below grade.
All bends in ground wire to be well rounded curves free of kinks, twists etc.
Resistance to earth as per the best practices.
An air sector controller (lightning rod) is to be installed at the top of the mast/tower.
Mast/tower components must conform to the following standards.
Lightning Rods: ANSI-TIA-222 F&G CAN/CSA-S37-01 standard.
Ground Rings: ANSI T1.334-2002, Section 5.3.1 and NFPA 70-2005, Article 250.53.
Electrolytic Rods: NFPA 70-2005, Article 250.53 and NFPA 780-2004, section
4.13.2.2.
Ensure all grounding complies with local electrical standards.
The grounding wire may be secured using the cable hanger stack.

Table of Contents

Other manuals for Redline Communications RDL-3000