COMMISSIONING AND MAINTENANCE
3 COMMISSIONING AND MAINTENANCE
3.1 Preparing for initial startup
The boiler must be started up for the rst time by the manufac-
turer's Technical Assistance Service.
Perform the following checks before starting up the boiler:
Check that the fuel shut-off cock and heating system
shut-off cock are open
Check that the central heating circuit pressure gauge
shows a pressure over 1 bar with the system cold. Check
also that the circuit is properly de-aerated
Check that the expansion vessel is correctly pre-charged
the electric connections have been made correctly
Check that the ue and air vents are made to applicable
laws and standards.
3.2 Initial startup
Once you have completed all the checks listed above, proceed as
follows to start up the boiler for the rst time:
Turn the boiler’s mains power switch ON
Set the room thermostat to the required temperature (~
20°C) or, if the system has a timer or timer-thermostat,
make sure that this is switched “ON” and adjusted to the
required temperature (~ 20°C).;
Open the control panel access door;
ONLY FOR MODELS GITRÈ 4-GITRÈ 5-GITRÈ 6
Turn the boiler thermostat to about the middle of the
section with three lines;
20
40
60
80
100
0
120
Turn the function selector to ON (I) and make sure that
the green power indicator lights.
NOTE in the case of GITRÈ 4 models, the burner only starts up
at the end of the fuel oil pre-heating phase.
20
40
60
80
100
0
120
The boiler now starts up and the burner remains lit until the
temperature setpoint is reached.