Rockwell Automation Publication 7000L-UM301F-EN-P - March 2020 53
Drive Installation Chapter 2
Figure 41 - TFB Fiber Optic connected
• Use supplied silicone (see Figure 42) to seal between cabinets to prevent
moisture or dirt from entering. Join sidesheets with M6 Taptite thread
forming screws in holes provided.
Figure 42 - Capacitor Cabinet