4. Inside the pedestal, locate and
remove 2x 5mm hex bolts and
washers that secure the clear
dome to the dome base.
x Take care to not drop the
bolts and washers when they
are released from the dome.
5. Carefully lift the clear dome from
the pedestal and place it to one
side.
x The louvered light diffuser will
remain attached to the
dome.
Figure 20 Dome Bolts
6. Turn the old GX53 bulb counter clockwise to release it from the surface fitting.
x Lift the LED bulb from the fitting.
x Dispose of the bulb as appropriate to the region of use.
7. Place the new GX53 LED bulb into the fitting then turn the bulb clockwise to
lock it in place.
8. Place the clear dome onto the pedestal.
x Make sure the bottom edge of the dome sits on the rubber seal of the
dome base.
9. Refit and carefully tighten the 2x 5mm hex bolts and washers to secure the
clear dome to the dome base.
x Do not overtighten the bolts.
10. Refit and secure the front fascia panel using the fixing removed at the start of
the process,
11. Apply electrical power to the pedestal.