Configuration
EVQM-V01-R6 Installation and Operation Manual Quantum Intelligent EV Charging Pedestal
December 2023 Page 26 of 52
Required Items
To connect to the charge point using the EV Connect and Monta applications you will
need the following items:
1. A smart phone with a camera, QR code reader software, and Bluetooth and
internet connectivity.
2. Monta Application – available from the Apple or Google App stores (as
appropriate to your type of phone).
3. Monta QR Code label(s) - Most charge points will be supplied with a Monta QR
code label(s) already attached. If this is not the case, the label supplied with the
charge point should be attached close to the socket to which it applies.
4. Rolec Charge point ID label – This is a removable label attached to a red and
black ‘tag’ that is supplied with the charge point and usually hung on one of the
sockets or attached to the enclosure.
x Following Installer installation and configuration of the charge point, the
removeable label may have been attached to the front of this Manual or to
the installation test report, or to the property’s fuse box/consumer unit.
x There is an identical label attached to the communications board inside the
charge point enclosure.
Preparation
To configure the charge point for correct operation, there are important steps that must
be performed by the installer and/or the charge point owner/operator.
NOTE:
The process of configuration for domestic installations is different to charge points used
in a commercial installation. This is an administration difference, and the model of
charge point does not define the type of installation.
x A commercial installation is usually one that is at a business property. It does not
necessarily mean that the charge point is being used to generate revenue.
x A domestic installation is usually one that is at a residence/dwelling but up to 3
charge points used on a commercial site could be regarded as a domestic
installation. If you are not sure about the status of your installation/site, contact
Rolec for clarification.
The note (immediately below) can be ignored if you have completed
the Monta Onboarding Form and have already received a link from
Monta prior to installing the charge point(s).
If you are reading this before travelling to the site, the QR Code
shown opposite will take you to the form.