EasyManua.ls Logo

Sartorius arium pro - Unpacking and Installation Guide; Contents of the Unpacking Package

Sartorius arium pro
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
arium
®
pro Operating Manual
Unpacking and Installation
2. Unpacking and Installation
We recommend that you have the set-up and initial startup of your arium
®
pro
system carried out by a qualified Sartorius service technician.
2.1 Unpacking
Remove your arium
®
pro system from its packaging. You will find the accessories
inside the arium
®
pro housing and in the top cover of the box. The equipment
supplied includes the following:
Part description Qty.
arium
®
pro system (with pre-installed display | dispenser unit) 1
Feed water tubing with quick-fit adapter, PE, a” outer diameter,
length 2.40 m
1
Timed dispense tubing, PVDF,
¼” outer diameter, length 2.40 m with adapter for the final filter and
adapter for connection to the dispenser unit
1
Power cable 1
Operating instructions 1
arium
®
Quality Assurance Certificate 1
Wall mounting bracket for arium (on models used as wall-mounted
systems)
1
Tubing adapter for feed water with ½” internal thread and a” outer
diameter
1
Two-part tubing adapter for feed water with G ¾” internal thread and
a” outer diameter
1
The cartridges are not included in the equipment supplied with your arium
®
pro
system.

Other manuals for Sartorius arium pro

Related product manuals