EasyManua.ls Logo

Sartorius arium pro - Initial Startup Procedures; Important Voltage and Connection Requirements; System Startup Sequence; Setting the Display Language

Sartorius arium pro
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
arium
®
pro Operating Manual
Initial Startup
4. Initial Startup
After you have installed your arium
®
pro system, make the electrical connections and
put the system into operation.
According to device specifications, this requires a supply voltage of 230 - 240 V,
50 Hz or 115 V, 60 Hz, depending on the country standard. You may not connect the
system to the power supply if the connection conditions at the setup location do not
correspond to the information on the manufacturer's ID label for your arium
®
pro.
It takes approx. 45 minutes to start up the arium
®
pro.
For initial startup, carry out steps 4.1 to 4.8. This operating manual will guide you
step-by-step through the sequence of the displays.
4.1 System Startup
All system settings (e.g. date, time, displayed values, etc.) configured during initial
startup can be subsequently changed in the system menu.
t Connect the power plug on the power supply of your arium
®
pro system to the
mains voltage. Next, switch on your arium
®
pro system via the power switch.
The arium
®
pro system will then perform a system check and display the start screen
shown on the right.
4.2 Setting the Language
t Select the language for the display. The factory setting is English.
Not all languages are visible on the display at the same time.
Scroll with the arrow keys to display all languages.
Set language
English
Deutsch
Français
Italiano

Other manuals for Sartorius arium pro

Related product manuals