Care and Maintenance
Cubis MSE Operating Instructions 81
Transporting the Parts (Large Analytical Draft Shield)
t Get the box for the individual parts of the balance ready�
t Place the bottom foam piece in the box�
t Place the panels in the packaging:
1) Place the upper draft shield panel into the packaging (handle upwards)�
2) Place the side draft shield panel into the packaging (handle upwards)�
3) Place the other side panel into the packaging (handle downwards)�
t Then place the top foam piece in the box�
1
2
3

Other manuals for Sartorius Cubis Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sartorius Cubis Series and is the answer not in the manual?

Sartorius Cubis Series Specifications

General IconGeneral
DisplayColor touch screen
Readability0.01 mg to 1 g
InterfacesUSB, Ethernet, RS-232
CalibrationInternal and external
HousingDie-cast aluminum
Response TimeVaries by model
Pan SizeVaries by model
Operating Temperature10°C to 30°C
ComplianceGLP
Power Supply100 – 240 V, 50/60 Hz
CapacityVaries by model (up to 64 kg)
RepeatabilityVaries by model
LinearityVaries by model