14. After returning to the Kerys home screen,
The configuration will only be taken into account if the following operations are carried out:
Turn on the battery isolator switch.
Wait 5 seconds.
Turn off the battery isolator switch.
Important
Operations to be carried out on each generating set of the power plant.
Important
6.3.8 Use
6.3.8.1. Choice of priority generating set in power plant (if equipped)
Mnemonic aid info for menus:
“1” – “7” – “4” – “3” – “GS selection” “Priority selection” “Valid”
15/07/09 19:10 :00 GS 1 Welcome Stop Faults Alarms
- 1 -
Operation
- 6 -
System
- 2 -
Fault finding
- 5 -
Configuration
- 3 -
Archiving & Metering
- 4 -
Maintenance
1. Press “Operation” on the touch screen.