EasyManua.ls Logo

Segway SNARLER SGW570A6 2021 - Cylinder Head Installation

Segway SNARLER SGW570A6 2021
386 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGINE TOP END
ENGINE TOP END
3-5-34
Cylinder Head Installation
Cylinder Head Installation
Install:
Dowel Pins
A
New Cylinder Head Gasket
B
Camshaft Chain Guide
C
Camshaft Chain Guide
D
Shoulder Bolts
E
(using a T40 driver)
Tighten:
Torque
Shoulder Bolts
9.8 N·m (1.0 kgf·m, 87 in·lb)
Apply a non-permanent locking agent to the bolts
E
.
Install:
Cylinder Head Assembly
A
Cylinder Head Bolts M11
×1.25×150
B
Bolts M6
×90
C
Tighten the cylinder head bolts (M11)
B
following
the tightening sequence as shown.
First Torque
Cylinder Head Bolts (M11)
B
25 N•m (2.5 kgf•m, 18 ft•lb)
Final Torque
Cylinder Head Bolts (M11)
B
75 N•m (7.7 kgf•m, 54 ft•lb)
Tighten the Bolts M6×90
C
.
Torque
Bolts M6×90
C
9.8 N•m (1.0kgf•m, 87in•lb)
A
A
B
B
E
E
C
C
D
D
A
A
1
1
4
4
2
2
3
3
B
B
C
C
Cylinder Head Installation

Table of Contents

Related product manuals