7SR210 & 7SR220 Commissioning & Maintenance Guide
Page 18 of 82 © 2013 Siemens Protection Devices Limited
2.2.1  Definite Time Overcurrent. (50)
If DTL setting is small, gradually increase current until element operates.
If DTL is large apply 0.9x setting, check for no operation, apply 1.1x setting, and check operation.
Apply 2x setting current if possible and record operating time.
Phase  Dir.
(Amps)
(sec)
Amps
Tol
2 x Is
Tol
L1
A
L2
B
L3
C
Check correct indication, trip output, alarm contacts, waveform record.
2.2.2  Inverse Time Overcurrent. (51)
It  will  be  advantageous to map the function being  tested to  temporarily  drive the  relevant Pickup  output in the
Pickup Config sub-menu in the Output Config menu as this will allow the Pick-up led to operate for the function.
Gradually increase current until Pickup LED operates.
Apply 2x setting current and record operating time,
Apply 5x setting current and record operating time.
Compare to calculated values for operating times
Gradually reduce current until the element drops off and record the level.
P.U.
D.O.
&
TIMING
TESTS
Ph. Dir
Char.
Curve
Is
(A)
TM
(Amps)
(Amps)
Tol
(sec)
(sec)
Tol
L1
A
L2
B
L3
C
Calculated Timing values in seconds for TM =1.0
Curve 2 xIs 5 xIs
IEC-NI 10.03 4.28
IEC-VI 13.50 3.38
IEC-EI 26.67 3.33
IEC-LTI 120.00 30.00
ANSI-MI 3.80 1.69
ANSI-VI 7.03 1.31
ANSI-EI 9.52 1.30
Note that the operate time may be subject to the Minimum op time setting for the element and/or may have a
Follower DTL applied.