22 General
MOBILETT Plus HP SPR8-220.101.04.03.02 Siemens AG
07.05 CS PS 24
Page 22 of 64
Medical Solutions
3.3.2 Equivalent patient leakage current
measurement
n.a.
4. Mechanical checks n.a.
4.1 Are all wall, ceiling and floor mountings
firmly attached and in place, without any
damages?
n.a.
4.2 Are all mechanically moved system
parts clean and smoothly running (lubri-
cated, if required)?
2.2.5 Transport safeguard, checks:
SIM Damage
SIM Locking
2.2.8 Arm system and single tank, checks:
SIM Movement of the arm system
SIM Movement of the single tank fork
SIM Single tank movement
4.3 Are the wire cables, chains, belts and
spindles free from wear and tear?
2.2.1 Rear wheels, check:
SIM Drive belt
4.4 Mobile equipment: Are the wheels /
castors and brakes OK?
2.2.1 Rear wheels, checks:
SIM Damage
SIM Brake lining
SIM Secure mounting
SIM Ease of movement
2.2.2 Front wheels, checks:
SIM Secure mounting
SIM Ease of movement
2.2.3 Supporting wheels, checks:
SIM Ease of movement
SIM Damage
2.2.4 Brakes, checks:
SIM Uniformity
SIM Braking force
SIM Locking
4.5 Is there any unusual noise during oper-
ation (e.g., gearing)?
2.2.8 Arm system and single tank, check:
SIM Movement of the arm system
5. Functional checks n.a.
5.1 Function of the emergency-stop switch n.a.
Technical Safety Checks,
Test Certificate - check
Maintenance instructions – check/
Comments