Siemens AG SPR8-220.101.04.03.02 MOBILETT Plus HP
07.05 CS PS 24
Inspection and Maintenance 41
Page 41 of 64
Medical Solutions
2.5 Maintenance tests
Use these service programs to check the display, filament heating, rotating anode and
capacitors.
While the test is running, observe the display. If an error is determined during the course
of the test, the program is interrupted and the associated error is displayed, accompanied
by an audible signal.
Additional information about each test can be found in the section "List of test programs
available in service mode" in the Service Instructions. The test sequences are also
described in this section.
• Start the programs by activating the "Collimator lamp."
SIE Display test
PMF Filament test
PMF Rotating anode test
PMF Capacitor bank and charge test
If an error is determined during any of the tests, the current program stops and the follow-
ing message appears:
P04 Display test. Check whether the display and the LEDs light up and
whether the buzzer sounds. The test will automatically be repeated
once.
P01 Filament test. When the test is successfully completed, the following
message will appear for 4 seconds:
FIL PASS = The filament test was successfully completed.
P02 Rotating anode test. During this test, rotating anode start-up is checked
and the rotation frequency is displayed. The following message
appears when the test is successfully completed:
rot PASS = The rotating anode test was successfully completed.
P03 Capacitor bank and charge test. During the test, the actual voltage in
the capacitor bank is displayed. The following message appears when
the test is successfully completed:
CAP PASS = The capacitor bank and charge test was successfully completed.
Err xx = Test results are "not valid."