EasyManua.ls Logo

Siemens NXAIR - Page 108

Siemens NXAIR
436 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating the metering panel
108 NXAIR / 40 kA 110-0134.9 / 14
Push the upper end of the new protection fuse-link into the clamp.
Push the lower end of the new protection fuse-link into the clamp.
Perform replacement with all other fuse-links.
Fasten an insulating cover over each protection fuse-link at the upper and lower fixing point
using a plastic bolt M8x12 and washer 8.4 mm; to do this, turn the M8 bolt into the bolted
joint with simple hand force.
Fig. 176: Pushing the upper
end into the clamp
Fig. 177: Pushing the lower
end into the clamp
Fig. 178: Installation of
insulating covers
The protection fuse-links have been replaced.
INFORMATION
Final procedure steps
Next, insert the withdrawable metering part / metering truck into the panel.
After closing the high-voltage door, the panel can be integrated into the
course of operation again.
.

Table of Contents

Other manuals for Siemens NXAIR

Related product manuals