EasyManua.ls Logo

Siemens NXAIR - Page 343

Siemens NXAIR
436 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Accessing the connection compartment through the front
110-0134.9 / 14 NXAIR / 40 kA 343
To install the voltage transformer compartment, lift it approx. 2 cm. Push the voltage
transformer compartment into the panel and set it down on the base frame.
Fig. 633: Voltage transformer compartment
(5)
Shutter
(6)
Bottom side
Fix the voltage transformer compartment by screwing the bolts hand-tight:
10 bolts M8x20 with contact washers
Tighten the bolts with a tightening torque of 25 Nm.
Fig. 634: 10 bolted joints at voltage transformer compartment
Put the metal cover in upright position. To link the voltage transformer compartment and the
metal cover together, tighten the bolts hand-tight:
4 bolts M8x20 with contact washers
Tighten the bolts with a tightening torque of 25 Nm.
Fig. 635: 4 bolted joints on metal cover in voltage transformer compartment
5
6

Table of Contents

Other manuals for Siemens NXAIR

Related product manuals