EasyManua.ls Logo

Siemens NXAIR - Page 342

Siemens NXAIR
436 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Accessing the connection compartment through the front
342 NXAIR / 40 kA 110-0134.9 / 14
Fix the partition by screwing the bolts hand-tight:
8 bolts M8x20 with contact washers and plain washers size 8
acc. to ISO 7093
Tighten the bolts with a tightening torque of 25 Nm.
Fig. 631: 8 bolted joints on vertical partition
Install the protection plate in the switching-device compartment.
Fix the protection plate by screwing the nuts hand-tight:
4 nuts M8 with contact washers
Tighten the nuts with a tightening torque of 25 Nm.
Fig. 632: 4 bolted joints on protection plate of switching-device compartment
Prepare the voltage transformer compartment for installation by laying it down centrally in
front of the panel. The shutter (5) must point to the bushing plate.

Table of Contents

Other manuals for Siemens NXAIR

Related product manuals