Commissioning
8.2 PROFIBUS DP
Distributed I/O system
System Manual, 02/2018, A5E31861578-AF
71
8.2
PROFIBUS DP
8.2.1
Commissioning ET 200AL on PROFIBUS DP
Introduction
The commissioning of your distributed I/O system depends on the system configuration. The
following procedure describes the commissioning of the ET 200AL distributed I/O system on
a DP master.
Requirements for the ET 200AL distributed I/O system on a PROFIBUS DP
Note
Performing tests
You must ensure the safety of your plant. You therefore need to perform a complete
functional test and the necessary safety checks before the final co
mmissioning of a plant.
Also plan the tests to include any possible foreseeable errors. This helps to avoid
endangering persons or equipment during operation.
Procedure
The following table shows the chapters/documents in which the required actions are
described.
Table 8- 2 Requirements for the ET 200AL distributed I/O system on a PROFIBUS DP
Step
Procedure
See...
1
Mounting the ET 200AL interface module
Section Mounting (Page 23)
2 Setting the PROFIBUS DP address on the
ET 200AL PROFIBUS interface module
IM 157-1 DP interface module
(
https://support.industry.siemens.com/cs/ww/en
/view/89255073) manual, section Setting the
PROFIBUS DP address and terminating resis-
tor
3
Wiring the ET 200AL interface module
Section Connecting (Page 28)
4 Configuring the ET 200AL interface mod-
ule
Section Configuring (Page 47)
5 Turning on the supply voltage for the
ET 200AL interface module
IM 157-1 DP interface module
(
https://support.industry.siemens.com/cs/ww/en
/view/89255073) manual
6 ET 200AL interface module automatically
switches to RUN mode
-