832-6063
.0 * DESCRIPTION SIMOSEC *
REVISION 02
13
D
e
script
ion
S
w
itch
posit
ions of the th
ree
-position switch
Fig. 8:
Switch
posi
tions of the t
hree-position
switch
Three-po
sition swit
ch-disconne
ctor
up to 600
A
Switch
position
CLOSED
OPEN
GROUND
ED
a
Bus bar connectio
n
s
Feeder, e.g., for
cable co
nnection
12
14
Table of Contents
Default Chapter
3
Table of Contents
3
Safety Instructions
5
1 Introduction
5
2 Qualified Person
5
3 Signal Words
5
4 Dangerous Procedures
6
5 Field Service Operation
6
Description
7
6 Features
7
7 Panel Versions
9
8 Components
10
Three-Position Switch-Disconnector
10
Operating Mechanisms for the Three-Position Switches
11
Current and Voltage Transformers
15
Protection and Control Equipment
16
HV HRC (Current Limiting) Fuse Assembly
17
Interlocks
19
Bus Bars
21
Cable Connection
21
Rating Plates
22
Ready-For-Service" Indicator for SF Gas
23
Voltage Detection Systems
24
Accessories
25
Electrical Data, Pressure Values, Temperature
27
9 Technical Data
27
Tightening Torques
28
Protection against Solid Foreign Bodies, Electric Shock and Ingress of Water
29
Standards and Guidelines
30
Type of Service Location
30
Service Conditions
31
Insulating Capacity and Site Altitude
32
Make-Proof Grounding Switch (Feeder Grounding Switch)
33
Selection of HV HRC (Current Limiting) Fuses
33
Three-Position Switch-Disconnector
33
Cable Terminations
34
Installation
35
10 Receiving, Handling & Storage
35
11 Unloading the Switchgear and Transporting to the Place of Installation
39
Installing the End Wall
44
12 Installing the Panels
44
Aligning the Panel and Fastening to the Foundation
45
Aligning and Joining Another Panel
46
Installing the Bus Bar
48
Installing the Ground Bus Bar
51
Connecting the Station Ground Grid to the Switchgear Frame
52
Installing the End Wall
52
13 Connecting High Voltage Cables
53
Preparing Connection of High Voltage Cables
53
Cable Connection Types
54
Installing Cold Shrink Insulation at Cable Connections
56
Connecting Cable Panel to High Voltage
61
Connecting Fuse Switch Panel to High Voltage
62
Connecting Metering Panel to High Voltage
63
Connecting Low Voltage Wiring
64
Connecting the Space Heater
64
14 Installing and Connecting Low Voltage Equipment
64
Installing Secondary Cables
64
Checking the Assembly Work and the Accessories
65
Instructing the Operating Personnel
65
15 Switchgear Extension
65
Final Work
66
Testing the Switchgear Electrically
66
Operating the Switchgear for Test
67
Testing
68
Connecting Operating Voltage (High Voltage)
69
16 Placing SIMOSEC Switchgear into Service
65
Safety Instructions
65
Operation
70
17 Indicators and Control Elements
70
18 To be Observed for Operation
71
Verification of Readiness for Service
71
Verification of Safe Isolation from Supply of a Feeder
71
Indicators and Control Elements of the Three-Position Switch
73
19 Operating the Three-Position Switch
73
Preconditions for Operation
75
Switching the Three-Position Switch to CLOSED Position
75
Switching the Three-Position Switch to OPEN Position
76
Switching the Three-Position Switch to GROUNDED Position
77
Switching the Three-Position Switch from GROUNDED to OPEN Position
79
Switching the Three-Position Switch with FII-Protection-System (Option)
80
Indicators and Control Elements of the Make-Proof Grounding Switch
82
20 Operating the Make-Proof Grounding Switch
82
Preconditions for Operation
83
Switching the Make-Proof Grounding Switch to GROUNDED Position
84
Switching the Make-Proof Grounding Switch to OPEN Position
85
21 Grounding of Panels that Do Not Have Switching Devices
86
Maintenance
87
22 Switchgear Maintenance
87
Recommended Hand Tools
88
Recommended Maintenance and Lubrication
89
Cleaning the Switchgear
90
23 Access to the Switchgear
91
Checking Corrosion Protection
91
Identifying the Panel
91
Returning SIMOSEC Switchgear to Service
91
Removing the Cable Compartment Cover
92
Removing the Cover of the Compartment for Customer Low Voltage Equipment
95
Removing the Cover of the Bus Bar Compartment
96
24 Testing
96
Verification of Grounding
96
Verification of Correct Terminal-Phase Connections
97
Cable Testing
98
Cable Sheath Testing
99
Preparing Fuse Replacement
99
25 Replacing HV HRC (Current Limiting) Fuses
99
Checking the Fuse Tripping Mechanism
100
Removing HV HRC (Current Limiting) Fuse Link
100
Completing Fuse Replacement
102
Installing the HV HRC (Current Limiting) Fuses
102
26 Switchgear Recycling
103
27 Help
103
28 Index
104
5
Based on 1 rating
Ask a question
Give review
Questions and Answers:
Need help?
Do you have a question about the Siemens SIMOSEC and is the answer not in the manual?
Ask a question
Siemens SIMOSEC Specifications
General
Brand
Siemens
Model
SIMOSEC
Category
Power distribution unit
Language
English
Related product manuals
Siemens SIVACON 8PS
210 pages
Siemens SIPROTEC 7SJ46
77 pages
Siemens SIPROTEC 7XR81
70 pages
Siemens SIPROTEC 7RW600
168 pages
Siemens SIPROTEC 5 V8.83
296 pages
Siemens SIPROTEC 7XR8004
70 pages
Siemens SIPROTEC 4 7VE61
330 pages
Siemens SIPROTEC 4 7SD80
416 pages
Siemens SIPROTEC 5 Series
254 pages
Siemens SIPROTEC 7SS523 V3.2
440 pages
Siemens SIPROTEC 7SS523 V3.3
440 pages
Siemens SIPROTEC 7SS522 V4.6
440 pages