EasyManuals Logo

Simrad AP50 Installation Manual

Simrad AP50
142 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #50 background imageLoading...
Page #50 background image
Installation
20222410 / B 41
Gn
Red
Blu
REMOTE
R3000X
REMOTE CONTROL
Yel
JD5X DISTRIBUTION UNIT
POWER PCB
TB1
TB2
TB3
TB5
Lamp
Stbd
Port
Gnd
REMOTE
TB4
Figure 2-38 R3000X Remote Control Connection
2.15 JS10 Joystick
Refer to separate installation procedure for JS10 (document no.
20221610)
2.16 S35 NFU Steering Lever
The S35 NFU Steering Lever may be mounted to the bulkhead
or to a panel by two screws from the front. The cable is
connected to the junction unit according to Figure 2-39. If
necessary, interchange the Port and Stbd wires to the screw
terminals in the junction unit to make the direction of the lever
movement coincide with the direction of the rudder movement.
S35
STEERING LEVER
NOTE!
Disregard the color code
on the terminal label.
REMOTE
JD5X DISTRIBUTION UNIT
POWER PCB
TB1
TB2
TB3
TB5
Brn/Wh
Pnk/Gry
Grn
REMOTE
TB4
Yel
Stbd
Port
Gnd
Lamp
Figure 2-39 S35 NFU Steering Lever Connection to Distribution Unit
The steering lever is opened by removing the three screws on
the back cover. Inside are two sets of micro-switches, a printed
circuit board with a plug-in terminal, and a jumper strap.

Table of Contents

Other manuals for Simrad AP50

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Simrad AP50 and is the answer not in the manual?

Simrad AP50 Specifications

General IconGeneral
BrandSimrad
ModelAP50
CategoryAutopilot System
LanguageEnglish

Related product manuals