EasyManua.ls Logo

Ski-Doo Summit 583 1998 - Page 148

Ski-Doo Summit 583 1998
398 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 04 ENGINE
Subsection 09 (ROTARY VALVE, COOLANT PUMP AND RESERVOIR)
04-09-8
Step : Align 360° line of degree wheel here
Step : Find 132° on degree wheel and mark here
1. Opening mark
2. Bottom of MAG inlet port
For
closing
mark, first align 360° line of degree
wheel with TOP of
MAG side
inlet port. Then,
find 52° line on degree wheel and mark crank-
case at this point.
Step : Align 360° line of degree wheel here
Step : Find 52° on degree wheel and mark here
1. Top of MAG inlet port
2. Closing mark
Position rotary valve on shaft splines to have
edges as close as possible to marks.
NOTE:
Rotary valve is asymmetrical. Therefore,
try turning it inside out then reinstall on splines to
determine best installation position.
Apply injection oil on rotary valve before closing
rotary valve cover.
To Time Rotary Valve Exactly to
Specifications
NOTE:
If desynchronization (out of spec.) is un-
known, install rotary valve to determine it before
proceeding with the following.
First Method
Turn crankshaft to bring
MAG
piston to TDC.
Scribed marks of crankshaft and upper crankcase
must align. These marks were scribed to deter-
mine desynchronization.
Install brass gear on rotary valve shaft with its
marked spline 4 positions (splines) away for one
degree of desynchronization. Turn in the opposite
direction of desynchronization. For instance, a ro-
tary valve is retarded by 2.5°, turn brass gear by
10 splines counterclockwise.
Second Method
Turn crankshaft to bring
MAG
piston to TDC.
Scribed marks of crankshaft and upper crankcase
must align. These marks were scribed while de-
terminating desynchronization.
For each degree of desynchronization, rotary
valve shaft should be turned in the opposite direc-
tion by about 5 splines on the rotary valve gear.
Note position of rotary valve gear mark when
brass gear disengages worm gear of crankshaft at
removal of rotary valve shaft. From this position,
turn shaft accordingly then reinstall.
For instance, take a valve advanced by 2°.
1. Position of mark when brass gear disengages worm gear
2. Advanced by 2°
3. Position of mark before installation (about 10 splines from original
position)
1,2, Screw and Rotary Valve Cover
Install O-ring and cover then torque screws to 22
N•m (16 lbf•ft) in a criss-cross sequence.
132°
F01D2JA
1
2
1
2
1
2
52°
F01D2KA
1
1
2
2
1
2
A16C18A
1
3
2

Table of Contents

Related product manuals