EasyManua.ls Logo

Ski-Doo Summit 583 1998 - Checking Operation

Ski-Doo Summit 583 1998
398 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 04 ENGINE
Subsection 06 (OIL INJECTION SYSTEM)
04-06-5
CHECKING OPERATION
On Vehicle
NOTE:
Main oil line must be full of oil. See bleed-
ing procedure above.
Lift rear of vehicle and support with a mechanical
stand. Unbolt banjo fittings from pump. Start en-
gine and stop it as soon as it fires.
Check that oil level in small oil lines is passed ban-
jo fittings end by about 25 mm (1 in) (this will be
indicated by a clear section of small oil lines of
about 25 mm (1 in)). Repeat the procedure until
this condition is attained.
Reconnect banjo fittings with a washers on each
side, start engine and run at idle while holding the
pump lever in fully open position. Oil columns
must advance into small oil lines.
TYPICAL — ENGINE AT IDLE
1. Oil columns advancing
2. Washer on each side
3. Fully open position
If not, remove pump assembly and check the
pump gear and drive shaft (if applicable) for de-
fects, replace as necessary. Test pump as de-
scribes below.
NOTE:
Through normal use, oil level must not
drop in small tubes. If oil drops, verify check valve
operation in banjo fittings.
Oil Pump Test Bench
Connect a hose filled with injection oil to main line
fitting. Insert other hose end in an injection oil
container. Using a counterclockwise rotating drill
rotate pump shaft. Oil must drip from outer holes
while holding lever in a fully open position. If not
replace pump.
TYPICAL
1. Fully open position
2. Counterclockwise rotating drill
3. Main line
A15C17A
1
23
A15C18A
2
1
3

Table of Contents