SnaponEEWH330AHandspinWheelBalancer
PREINSTALLATIONCONSIDERATIONS
1.7DIMENSIONSOFTHEMACHINE

Figure4‐ActualFootprintDimensions.
1.8REQUIREDINSTALLATIONAREA
Make sure that from the operating position the
user can see all of the machine and the
surroundingarea.

The operator should prevent non authorized
persons and/or objects from entering the area
whichmaycreatepotentialhazards.
The machine should be installed on a stable level
floor.Donotinstallthemachineonaunevenfloor.

If the balancer is to be installed on a raised floor,
thefloormusthaveacapacityofatleast110lbsper
sqft.(5000N/m²‐500kg/m²).
It is not required to secure the machine to the
floor.
Installthemachineinadry,coveredarea.
The installation of themachinerequires a working
area of at least62 x50(1574x 1270 mm)
(Figure5).
NOTE:Donotinstallthebalance
rbelowgradelevel
orinapit.


Figure5‐RecommendedWorkArea
1.9INSTALLATIONINSTRUCTIONS
CAUTION!CAREFULLYREMOVETHEBALANCERFROM
THEPALLET.
Removethehardwarethatsecuresthemachinetothe
palletandslidethebalancerontothefloorwhereitisto
beinstalled.
THEUNITISHEAVYANDTHEWEIGHTISNOTEVENLY
DISTRIBUTED.
DONOTLIFTTHEBALANCERBYTHESHAFT.
DROPPINGTHEUNITMAYCAUSEPERSONALINJURY
OREQUIPMENTDAMAGE.
2.0BALANCERINSTALLATION
MountingtheShaftAdapter
IMPORTANT!CHECKTHATTHESURFACESARE
PERFECTLYCLEANANDNOTDAMAGED.ANINCORRECT
MOUNTINGMAYRESULTINSIGNIFICANTIMBALANCE.
A. Mountthethreadedshaftontothearborofthe
balancer.Tightenfirmlyusingsuppliedrod.
(Figure6).
