HYD 5/6/8/10/15/20KTL-3PH USER MANUAL
If the PV generation is less than
the load consumption, it will
discharge the battery to supply
power to the load.
If PV generation plus Battery
discharge power is less than the
load, the inverter will import
power from the grid.
The priority of power supply: PV, Battery, Grid
The priority of power consumption: Loads, Battery, Grid
If it is not allowed to export power to the grid, an
smart meter and/or CT needs to be installed, and the
"feed-in limit” function needs to be enabled.
7.3.2 Time-of-Use Mode
Mon. Tue. Wed. Thu. Fri. Sat. Sun.
If no rule applies, the Self-use Mode is active.