7 Setting
LED
Key
Down button: Move the cursor down or decrease the value.
ESC button: Return from the current interface or function.
Enter button: Conrm selection.
Up button: Move the cursor to the upper part or increase the
LCD
Display inverter information on the LCD display.
Description
Name
Blue light: The inverter is in normal state or Off-grid mode.
Blue ashing: The inverter is in waiting or checking status.
Off: The inverter is in a fault state.
Green: The battery communication is normal and working
Green ashing: The battery communication is normal and
Off: The battery does not communicate with the inverter.
Red light on: The inverter is in a fault state.
Off: The inverter has no error.
7.1 Control Panel
Indicator
68
69
Screen
light
Function
normally.
in an idle state.
value.
Setting
Step 6. After the upgrade is completed, the LCD screen displays "Upgrade
Successful".
Tip: If the display screen is stuck on "X1-Hybrid G4" after the upgrade,
please turn off the photovoltaic power supply and restart, and the inverter
will restart and return to normal. If not,
please contact our service @solaxpower.com for help.
(k)
Upgrade(DSP)
Upgrade Successful
Step 5. For DSP: Please wait for 10 seconds. When "Update" page shown as
as below, press down to select "DSP" and then press Enter. Please
confirm the firmware version again and press Enter to upgrade. The upgrade
takes about 2 minutes.
Update(DSP)
connect
Update(DSP)
>618.00360.00_Hybrid_
X1G4_DSP_V1.01_07
10.hex
(g)
Update
ARM
>DSP
( f )
(h)
Step 7. Pulg off the U disk, press "Esc" to return to the main interface, and
long press the enter key to exit the mode.
-Please strictly follow each step from step 1-6, don't miss
it.
-Please confirm the ARM/DSP firmware version on the
USB flash drive.
Caution!
Update(DSP)
Upgrading---------25%
Update(DSP)
(i)
(j)
DSP Erasing---------
Firmware Upgrading