EasyManua.ls Logo

Solcon RVS-DN 8 - Page 17

Solcon RVS-DN 8
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17 • Technical Data
________________________________________________________________________________________________
Signalling
Delay the opening of a line contactor at the end of SOFT STOP, thus allowing current to decrease to zero
before opening the contactor
Switch to / from Dual Adjustment settings with a time delay from the START signal (see Special Starting
section
8.2.3.1 page 92).
O/C SHEAR PIN
detection - when O/C Shear-pin is selected, the relay is energized upon SHEAR-PIN
detection (RVS-DN’s trip can be delayed 0-5 sec).
In this case, the relay incorporates on and off delays of 0-5 sec. each.
The O/C SHEAR PIN relay can be used for the following purposes:
Interlock with other systems
Signalling
Delay for operating a reversing combination of upstream contactors when SHEAR PIN is detected, thus
allowing clearing of a jam condition.

Table of Contents

Related product manuals