Troubleshooting Chart – Centre section
Motion Control Panel does
Is the connector labelled IN on the Motion
Control Panel seated correctly?
If no, re-seat as required.
Is the connector labelled WSINOUT on the
Workstation Panel seated correctly?
If no, re-seat as required.
Is the connector labelled WSINOUT on the
Motion Control Panel seated correctly?
If no, re-seat as required.
Is the connector labelled MONINOUT on
the Motion Control Panel seated correctly?
If no, re-seat as required.
Is the connector labelled MONINOUT on
the Monitor panel seated correctly?
If no, re-seat as required.
Is the connector labelled PL2 on the
Motion Control Panel seated correctly?
If no, re-seat as required.
Is the connector labelled MONINOUT on
the Motion Control Panel seated correctly?
If no, re-seat as required.
Is the connector labelled MONINOUT on
the Monitor Panel seated correctly?
If no, re-seat as required.
Remove Workstation Panel. Remove
display panel. Is the 30-pin ribbon
connector seated correctly?
If no, re-seat as required.
Is the connector labelled DVIDEO2 on the
CPU card seated correctly?
If no, re-seat as required.
Centre Section meter does
Is the connector labelled IN on the Meter
If no, re-seat as required.
Is the connector labelled PL11 on the
If no, re-seat as required.
AWS 900+ Owner’s Manual
A-17
Troubleshooting