OPERATING MANUAL PAT-1, PAT-2, PAT-2E, PAT-10 version 1.02
START/STOP button to
be pressed. At this stage
it is possible to return to
the previous test to repeat
it: press button.
Measurement of insulation
resistance has been
completed. If the
measurement result is
negative, further
measurements will not be
conducted. In case of the
positive test result:
If the AUTO-TEST
( ) mode is
on, the tester will
automatically run the
subsequent tests. If the
AUTO-TEST mode is off
the tester will wait for the
START/STOP button to
be pressed. At this stage
it is possible to return to
the previous test to repeat
it: press button.
Positive test result for the
tested device. The result
of each single test of the
sequence is positive.
Green LEDs of PASS
indication are on. On the
right side of the screen
the current time is shown.