Setup and connection
Operating Instructions Soyer Bolzenschweißtechnik 43
12. Setup and connection
12.1 Requirements for the installation location
The installation location for the stud welding device must be clean and dry. Ob-
serve the permissible temperatures in chapter “6.4 Technical data on BMS-8N(V)
stud welding device” on page 23. Ensure that ventilation for the stud welding de-
vice is sufficient. Do not install the stud welding device in an unventilated room.
There is a danger of overheating.
Ensure that the installation surface is flat, clean and stable.
The installation location and workplace must comply with legal requirements.
Ensure that the installation location has a good accessibility for maintenance
work.
Make sure that the stud welding device cannot be soiled by dust (especially metal
dust or chips) caused by work in the immediate surroundings (e.g. grinding work).
Danger from humid operation site or mobile use
There is a danger of electrocution when operating the stud welding device in a
humid environment.
• The stud welding device must only be operated stationary and in closed
and dry rooms. Mobile use is not permissible.
Danger from welding vapours
Vapours that are dangerous to health may occur, depending on the material of
the workpiece and/or the welding stud.
• Ensure suitable suction of welding vapours, if necessary.