43
S
Task
Stryker
Communications
Hospital Sta Telco
3. LEC brings PRI to
POD in building
Project Engineer -
verify analog line
to hub functions by
performing a test call
to the Hub.
Project Manager -
obtain PRI info and
provide to Project
Engineer.
Verify POD is where
requested.
Obtain Circuit ID
and switch specics.
Provide to Stryker
Project Manager.
Brings PRI to POD.
4. Information for
PRI line obtained
Project Engineer -
program CODEC.
5. PRI wiring is ex-
tended to the Hub
room
Project Manager or
Install Team - Verify
Hospital wiring to the
Hub Room is correct.
Extend the Demarca-
tion to the Hub Room
using proper wiring.
6. Connect the PRI
to the Hub
Connect the Hub to
the PRI line in hub
room.
Verify IMUX light
comes up green.
7. Turn Up PRI Line Be present for testing
on site.
Be present for testing to
provide access to Hub
room for LEC.
Test line at POD and
Hub room.
8. Test PRI Line Make both outgoing
and incoming calls.
Watch Switch Activity
and make any neces-
sary changes.
9. Verify Line
Registered with
ISDN provider
Call 1(800) 222-7956 to
verify.
Register line if not
done.
10. Ensure all PRI
information and
analog line to hub
go into Stryker
Install database
Project Manger - pro-
vide information to
Technical Support
Manager.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Stryker Operating Room Information System and is the answer not in the manual?

Stryker Operating Room Information System Specifications

General IconGeneral
BrandStryker
ModelOperating Room Information System
CategoryMedical Equipment
LanguageEnglish

Related product manuals