EasyManua.ls Logo

Stryker Power-PRO XT - Foot end fastener part replacement schedule

Stryker Power-PRO XT
87 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
74 6506-209-001 REV F www.stryker.com
Preventive maintenance
Regular inspection and adjustments (Continued)
Every 12 months or 24 hours
Inspect these items every 12 months or 24 hours, whichever comes first.
Item Inspect
Settings Cot and fastener fit and function
Safety bar connects to the vehicle safety hook
Cylinder Cylinder is adjusted - lock nut is tight and the cot stops
moving when it hits the dead stops
Manual backup release handle Returns to the stowed position
Litter All welds are intact, not cracked, or broken
Warning labels present, legible
Base All welds are intact, not cracked, or broken
Wheels
Check and adjust wheel locks
Retractable head section oxygen bottle holder (optional)
Straps and clips for wear
Defibrillator platform (optional) Straps not frayed or torn
Latch hooks are intact and secure
Foot end fastener part replacement schedule
For Performance-LOAD compatible cots, you must replace the foot end fastener parts every 18,078 calls. This is to
make sure that the Performance-LOAD remains functional. Follow this call volume time table to remain compliant with
this requirement.
Calls per day
Months
7
Not applicable
8
77
9 67
10 59

Table of Contents

Other manuals for Stryker Power-PRO XT

Related product manuals