46
4
INSTALLATIONSTÛV 21
.12 RECAP
1. Unpack and discard the
packaging.
2. Remove the insulated shell
from the fireplace.
3. If the adjustable stand was
chosen, install them.
4. If the outside air option
was chosen, install them.
5. Validate the integrity of
the pulley system.
6. Erect the frame and
validate the compliance of the
combustible materials.
7. Level the fireplace and place
the inner protection.
8. Connect the chimney and
the convection system.
9. Install the frame, the
drywall and the
cement board.
10. Finish the wall.
!
non combustible
framing