13. Fit clutch master cylinder & actuating rod.
14. Fit the brake lines to the inside of the long offside chassis rail and via the front cross member to the
nearside front brake.
15. Fit the brake light switch and front brake flexible hoses.
16. Fit the fuel tank sender unit and the fuel tank to the chassis.
17. Fit the fuel pump.
18. Run the 5/16” OD fuel line from the tank to the engine bay via the fuel pump.
19. Fill the fluid reservoir and bleed the braking system.
20. Fit the engine mountings and special bush and mounting to the gearbox.
21. Fit the gearbox mounting plate to the chassis.
22. Using an engine crane install the engine & gearbox subunit into the chassis.
23. Fit clutch hydraulic line and hose connection to the slave cylinder. Bleed the system.
24. Install the Suffolk modified prop shaft.
25. Fit the 6-part stainless steel exhaust system.
26. Paint the radiator matt black & fit electric cooling fan to radiator.
27. Radiator-mounting hoop, alloy radiator core (central to body) and top & bottom hoses.
28. Initial wiring.
29. Splined hubs, dummy brake drums and wheels and tyres.
30. Lift on the body.
31. Bolt down the body.
32. Test fit doors.
33. Final mounts and spacers.
34. Scuttle bracket and short stays.
35. Cut or test fit bonnet.
36. Body paint preparation and checks.
37. Refit body and doors.
38. Refit bonnet.
39. Handbrake cable.
40. Seat runners and floorboards.